
Learn More About Using Primavera Applications
This case study was presented at the OAUG Collaborate 09 conference by Project Partners’ Tamim Kulaly, PMP. This whitepaper and accompanying presentation provides a high level overview of new Primavera P6 features and includes a case study illustrating how firms are using Primavera with Oracle E-Business Suite Projects Applications to support business processes not possible with either system alone. You can register and download the documents here.
Integrating Primavera With Oracle EBS Projects Applications
Primavera Value Proposition video
Learn more about OP3 for Integration
Primavera Training - P3 to P6 Course (108)
This course is specially designed for users moving from Primavera Project Planner (P3) to P6. Numerous charts list how P3 fields and functionality map to P6, enabling users to leverage their existing knowledge of P3 and rapidly adapt to new features in P6. The course begins with navigation, menus, and terminology in P6, and introduces new ways to view layouts and run reports. The course also details how basic tasks in the project management life cycle are executed in P6, including how to create activities, assign and analyze resources, and update the project plan. An appendix at the back of the manual covers how to convert projects from P3 to P6. (NOTE: This course is designed for existing users of P3. Those who wish to learn Primavera P6, but are not P3 users, should take Course 102.)
Targeted roles: Program managers, project managers, planners/schedulers who are using P3.
Course length: 2 days
Course level: Basic
Prerequisite: Course 601 or knowledge of P3
Professional Development and Continuing Education Units: Earns 13 PDUs or 1.2 CEUs
PMI Program Number - 108
Learning Outcomes:
Day One:
Introduction to Primavera
- Describe Primavera solutions
- Describe P6
- Explain the difference between enterprise and project-specific data
Navigating in Primavera
- Log in
- Open an existing project
- Navigate in the Home window and Activities window
- Open an existing layout
- Customize a layout
- Save a layout
- Identify types of layouts
Menus and Terminology
- Identify the location of P3 commands in Primavera
- Identify the similarities and differences between P3 and Primavera terminology
Building Projects
- View and describe the Enterprise Project Structure
- Define the Work Breakdown Structure
- Create a project
- Navigate in the Projects window
- View and modify information in Project Details
Activities
- Define and review activity information in Activity Details
- Describe activity types
Dates in Primavera
- Identify Primavera date fields that are similar to those in P3.
- Identify new date fields in Primavera
- Review constraint dates
- Review actual dates
Formatting Schedule Data
- Group activities according to a specific criteria
- Sort activities
- Apply a filter
- Create a filter
- Modify bars in the Gantt Chart
Roles and Resources
- Describe roles
- Views the roles dictionary
- Describe resources
- Identify the differences between labor, nonlabor and material resources
- View the resource dictionary
Assigning Roles
- Assign roles to an activity
- Assign rates on roles
Day Two:
Assigning Resources and Costs
- Assign resources by role
- Assign labor, nonlabor, and material resources to activities
- Adjust Budgeted Units/Time for a resource
- Assign expenses to activities
Analyzing Resources
- Display the Resource Usage Profile
- Format a profile
- Format the timescale
Duration Types
- Determine which Duration Type works best in a given situation
- Assign a Duration Type to an activity
Calculating Percent Complete
- Describe the three Percent Complete types
- Determine which Percent Complete type to use based on how your organization
- reports progress
- Explain how activity percentages are calculated based on the Percent Complete type chosen
- Use weighted steps to calculate Percent Complete
Baselining the Project Plan
- Create a baseline plan
- Display baseline bars on the Gantt Chart
Updating a Project
- Describe several methods for updating the project schedule
- Use Progress Spotlight
- Status activities
- Reschedule the project
Auto Compute Actuals
- Describe the business rules for auto compute actuals
- Auto compute an activity
- Analyze the effect of auto compute actuals on an activity
- Auto compute a resource
- Auto compute an expense
Printing Layouts
- Customize the appearance of headers and footers
- Publish activity layouts as HTML pages
- Reporting Performance
- Describe reporting methods
- Run a schedule report
- Create a resource report with the Report wizard
- Create a report using the current layout
Tips and Tricks
- Use Undo to reverse actions in a project
- Use fill down to copy data in cells
- Establish user-defined fields
- Define global change parameters
- Run a global change
To schedule or get more information about Primavera training: Contact Us