This case study was presented at the OAUG Collaborate 09 conference by Project Partners’ Tamim Kulaly, PMP.  This whitepaper and accompanying presentation provides a high level overview of new Primavera P6 features and includes a case study illustrating how firms are using Primavera with Oracle E-Business Suite Projects Applications to support business processes not possible with either system alone. You can register and download the documents here.

Integrating Primavera With Oracle EBS Projects Applications

Primavera Value Proposition video

Learn more about OP3 for Integration

 

Primavera Training - Contractor Course (700)


This course provides hands-on training for contractors. It examines how to plan, schedule, control, and analyze projects.
Course level: Basic
Targeted role:
Contractors
Course Length:
2 days
Additional audiences:
Existing Primavera Contractor users
Prerequisite: Working knowledge of Windows
Professional Development and Continuing Education Units: Earns 13 PDUs or 1.3 CEUs
PMI Program Number – 700

Learning Outcomes:

  • Create a project including activities and resources
  • Schedule a project, and determine how to effectively optimize a project

At the completion of this course the student will be able to:

  • Create a project
  • Assign a calendar to a project
  • Add activities and relationships to a project
  • Organize a project using activity codes
  • Perform manual schedule calculations
  • Apply constraints to an activity
  • Modify activity information
  • Track progress on an activity
  • Create and customize layouts
  • Apply filters to a project
  • Customize the appearance of a project for reporting purposes
  • Import and export project data

Course Outline:

Day One:

  • Introduction
  • Navigating
  • Creating a project and Work Breakdown Structure
  • Creating Activities
  • Creating Relationships
  • Scheduling the Project
  • Assigning Constraints to a Project

Day Two:

  • Assigning Constraints to a Project
  • Adding Resources to a Project
  • Optimizing the Project
  • Baselining the Project
  • Executing the Project
  • Creating Output
  • Customizing Projects

Hands on Workshops & Exercises:

  • Creating a project
  • Modify Calendars
  • Adding activities and activity codes
  • Defining activity codes
  • Creating relationships in an activity
  • Modifying a project
  • Defining resources to a project
  • Assigning resources to an activity
  • Optimizing the schedule
  • Tracking project progress

To schedule or get more information about Primavera training: Contact Us